This paper proposes a sequential loading method, which finds the hourly changes of frequency and optimal load distribution between power stations. The method solves to minimize the aggregate cost in the electric power system (EPS). The method also calculates the surplus or deficit of an active power in EPS, hourly power flows of each transmission lines, active power losses in the networks. Computed and analyzed the optimal regimes of Mongolian EPS by the proposed method. The result confirmed that the method can potentially benefit to supply of frequency regulation. Developed software allows doing day-ahead market planning and intraday market preplanning in EPS, which improves electricity market model.

Improvement of the dispatching preplanning process in day-ahead electricity market using a sequential method

Muzi F.
2017-01-01

Abstract

This paper proposes a sequential loading method, which finds the hourly changes of frequency and optimal load distribution between power stations. The method solves to minimize the aggregate cost in the electric power system (EPS). The method also calculates the surplus or deficit of an active power in EPS, hourly power flows of each transmission lines, active power losses in the networks. Computed and analyzed the optimal regimes of Mongolian EPS by the proposed method. The result confirmed that the method can potentially benefit to supply of frequency regulation. Developed software allows doing day-ahead market planning and intraday market preplanning in EPS, which improves electricity market model.
2017
978-1-5386-1040-4
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11697/141746
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? 0
social impact