IFMIF-DONES is a powerful neutron irradiation facility for the study and qualification of materials planned as part of the European roadmap to fusion-generated electricity. Its main goal is to study properties of materials under severe irradiation in a neutron field similar to the one in a fusion reactor first wall. It is a key facility to prepare for the construction of the DEMO power plant envisaged to follow ITER. The decision to start the construction of IFMIF-DONES is expected imminent. In this paper we present and discuss several key technical studies and decisions to improve and optimize the engineering design of IFMIF-DONES which were carried out as part of the activities in the framework of the EUROfusion Early Neutron Source work package (2015-2020). The following topics are discussed in this paper: the new layout of the IFMIF-DONES SRF LINAC accelerator and high-energy beam transport line, 7Be impurity management approach for the lithium loop, a maintainable test cell concept, a revised layout of the access cell for the remote maintenance operations, and facilities for complementary experiments.

The IFMIF-DONES fusion oriented neutron source: Evolution of the design

Bernardi D.;Cappelli M.;
2021-01-01

Abstract

IFMIF-DONES is a powerful neutron irradiation facility for the study and qualification of materials planned as part of the European roadmap to fusion-generated electricity. Its main goal is to study properties of materials under severe irradiation in a neutron field similar to the one in a fusion reactor first wall. It is a key facility to prepare for the construction of the DEMO power plant envisaged to follow ITER. The decision to start the construction of IFMIF-DONES is expected imminent. In this paper we present and discuss several key technical studies and decisions to improve and optimize the engineering design of IFMIF-DONES which were carried out as part of the activities in the framework of the EUROfusion Early Neutron Source work package (2015-2020). The following topics are discussed in this paper: the new layout of the IFMIF-DONES SRF LINAC accelerator and high-energy beam transport line, 7Be impurity management approach for the lithium loop, a maintainable test cell concept, a revised layout of the access cell for the remote maintenance operations, and facilities for complementary experiments.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11697/228879
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 43
  • ???jsp.display-item.citation.isi??? 42
social impact