The goal of the ICARUS Project is the installation of a multi-kiloton LAr TPC in the underground Gran Sasso Laboratory. The programme foresees the realization of the detector in a modular way. The first step is the construction of a 600 ton module which is now at an advanced phase. It will be mounted and tested in Pavia in one year and then it will be moved to Gran Sasso for the final operation. The major cryogenic and purification systems and the mechanical components of the detector have been constructed and tested in a 10 m(3) prototype. The results of these tests are here summarized.

ICARUS 600 ton: A status report

CAVANNA, FLAVIO;PETRERA, SERGIO;
2000-01-01

Abstract

The goal of the ICARUS Project is the installation of a multi-kiloton LAr TPC in the underground Gran Sasso Laboratory. The programme foresees the realization of the detector in a modular way. The first step is the construction of a 600 ton module which is now at an advanced phase. It will be mounted and tested in Pavia in one year and then it will be moved to Gran Sasso for the final operation. The major cryogenic and purification systems and the mechanical components of the detector have been constructed and tested in a 10 m(3) prototype. The results of these tests are here summarized.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11697/6471
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? 3
social impact