This paper is focused on settlement prediction for design of a cut-and-cover tunnel, part of an important high-speed railway line. The tunnel, provided with a compensated foundation, is built by staged construction in an open pit excavation below the water table. The method and results of analysis of consolidation under staged construction are presented and discussed.

Settlement prediction for staged construction of a cut-and-cover tunnel for a high-speed railway line

MONACO, Paola
;
TOTANI, Gianfranco
2003-01-01

Abstract

This paper is focused on settlement prediction for design of a cut-and-cover tunnel, part of an important high-speed railway line. The tunnel, provided with a compensated foundation, is built by staged construction in an open pit excavation below the water table. The method and results of analysis of consolidation under staged construction are presented and discussed.
2003
80-86769-01-1
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11697/35572
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact